Agility migrates enterprise data infrastructure and legacy applications to AWS, Azure, and Google Cloud with zero data loss and no unplanned downtime. Across 80+ cloud migration projects, average infrastructure cost drops 40-60% post-migration and deployment frequency increases 3-5x. Typical project completes in 8-16 weeks depending on data volume and application complexity.
Across every production migration we have delivered
Average infrastructure cost saving post-migration
Post-cutover across all migrated production environments
Average ETL and pipeline performance improvement post-migration
Agility migrates six categories of workload: relational databases (Oracle, SQL Server, MySQL) to managed cloud equivalents; legacy monolithic applications to containerised microservices on Kubernetes; on-premises data warehouses to Snowflake, Redshift, or BigQuery; file and object storage to S3 or Azure Blob; ETL pipelines to cloud-native orchestration (Airflow, Glue, Data Factory); and virtualised server fleets to auto-scaling cloud infrastructure. Every migration follows a assess-plan-migrate-optimise sequence. Assessment takes 1-2 weeks and produces a full inventory, dependency map, and risk register before a single workload moves. Average downtime during cutover: under 2 hours for database migrations, zero for application migrations using blue-green deployment.
Full inventory of on-premises components, dependencies, and migration risk mapping
Cloud platform selection, schema mapping, security design, and phased cutover planning
Cloud environment provisioned and tested in parallel with live on-premises systems
Batch-by-batch migration with validation gates and rollback capability at every stage
IAM, Key Vault, private endpoints, audit logging, and RLS configuration
Production cutover with hypercare support period, performance monitoring, and optimisation
Every production migration we have delivered has been completed without data loss through phased validation, parallel testing, and transaction management.
We handle the complete migration stack — database, ETL, analytics, reporting, security, and delivery automation — without splitting the engagement across multiple vendors.
We build infrastructure as code from day one meaning every environment is reproducible, version-controlled, and auditable — not a collection of manually provisioned resources.
Our migrations are designed around zero disruption. Parallel environments, phased cutovers, and rollback plans are built into every engagement before a single object is moved.
Everything you need to know about our cloud migration process
Schedule a cloud assessment with our migration specialists to build a zero-risk roadmap for your infrastructure modernisation.
Schedule Your Cloud Assessment