FMCG Azure Migration Banner
FMCG

FMCG Enterprise Azure Cloud Migration

Migrating 200+ stored procedures and 1,000+ SSRS reports from legacy on-premises FMCG infrastructure to Microsoft Azure in 20 weeks with zero data loss and 99.9% uptime post-cutover.

40%
Cost Reduction

In infrastructure and operational overhead post-migration

98%+
Report Conversion

Success rate across 1,000+ SSRS to Power BI Paginated Reports

20 Weeks
Full Migration

From assessment to production cutover

99.9%
Uptime

Maintained post-cutover with zero data loss during transition

Project Overview

Industry

FMCG

Region

Global

Project Size

Enterprise — 200+ Procedures, 1,000+ Reports

Time Frame

Q1 2025 - Completed

Technology Stack

Azure Data Factory
Azure SQL Managed Instance
Power BI Paginated Reports
Azure AD & Key Vault
Power Automate
Terraform

The Challenge

Legacy On-Premises FMCG Infrastructure

A large FMCG enterprise operated its entire data platform on aging on-premises infrastructure: 200+ stored procedures running critical business logic, SSAS analytics cubes, and over 1,000 SSRS operational reports. High maintenance overhead consumed significant engineering capacity, manual report distribution created bottlenecks, limited scalability was blocking growth, and single points of failure meant any server issue could halt reporting and ETL operations across the business.

Transformational Results

Cloud-Native FMCG Data Platform

We delivered a complete cloud migration in 20 weeks — migrating 200+ stored procedures with 98%+ success, converting 1,000+ SSRS reports to Power BI Paginated Reports with 30% faster rendering, and rebuilding the entire ETL layer on Azure Data Factory. Post-cutover, infrastructure costs fell 40%, maintenance effort dropped 50%, and the platform maintains 99.9% uptime with automated failure recovery — all with zero data loss through the entire transition.

Migration Excellence

Migrated 200+ stored procedures to Azure SQL Managed Instance with 98%+ success rate and zero data loss

Converted 1,000+ SSRS reports to Power BI Paginated Reports with 30% faster rendering post-migration

Completed the full digital transformation in 20 weeks from assessment phase through production cutover

Operational Transformation

Reduced infrastructure costs by 40% through cloud-native pay-as-you-go architecture

Cut maintenance effort by 50% through automated orchestration, monitoring, and patch management

Achieved 25% faster ETL processing after migration from SSIS to Azure Data Factory

Challenges & Solutions

High-Risk Migration of Business-Critical Stored Procedures

Problem

200+ stored procedures supported live production operations for an FMCG enterprise — any migration error could halt operations and impact supply chain, inventory, and financial reporting.

Solution

Conducted comprehensive compatibility analysis, migrated in phased batches with parallel validation runs, and tested all stored procedure functionality post-migration before decommissioning on-premises systems.

Impact

98%+ migration success rate with zero data loss and zero production incidents at cutover

1,000+ Report Conversion Without User Disruption

Problem

SSRS reports had varied layouts, data sources, parameterisation logic, and subscription configurations — bulk conversion without a structured framework would produce broken reports and block business operations.

Solution

Built a systematic conversion framework prioritising reports by business criticality, converting RDL files to Power BI Paginated Report format, updating all data source connections, and validating output against original SSRS versions before go-live.

Impact

98%+ conversion success rate with 30% faster rendering and preserved multi-format export support

Complex Multi-Tenant Security Requirements

Problem

Multiple internal business units required strict data segregation — a misconfigured security model would expose cross-tenant data and create compliance risk across the organisation.

Solution

Implemented Row-Level Security with dynamic user-based filtering, full Azure AD integration, Key Vault-managed secrets, private endpoints, and comprehensive audit logging across all data access paths.

Impact

Secure multi-tenant access with full IAM governance from day one post-cutover

Single Points of Failure in Legacy Architecture

Problem

The on-premises infrastructure had no high-availability design — server failures directly halted ETL processing and report delivery for the entire business with no failover capability.

Solution

Deployed Azure SQL Managed Instance with high-availability configuration, Azure Data Lake Storage as a resilient data tier, and ADF with automated retry logic — eliminating all single points of failure.

Impact

99.9% uptime achieved post-cutover with automated failure recovery across all pipeline and reporting layers